At power unit No.7 310 MW steam power unit was superstructed by a gas turbine with capacity of 110 MW produced by JSC “NPO “Saturn”.
Next to the main building of the unit, an extension is erected to house a gas turbine plant, a steam boiler for operation as part of CCGT-420 was modernized, a booster compressor station was constructed.