Regional dispatch center of energy system, Perm
Location
Perm
Client
System Operator of the United Power System, JSC
General contractor
VIS Group
Concession timelines
2010 to 2012
VIS Group completed reconstruction, engineering and technological equipping of administrative building of Regional dispatch center of Perm region energy system.
The purposes of reconstruction were the following:
- Creation of environment for operation of the dispatch center, necessary for improving reliability of operative-dispatch control in RDC operational area;
- Improvement of observability of current condition of dispatched objects;
- System endurance improvement.
Basic works in terms of the project: upgrading of provided technological equipment; equipment supply at Groups own expense.
The building was commissioned in the highest level of readiness and just-in-time.